ElectionsLocal

Measure S Fails With 6,509-Vote Deficit as 40-Year Transportation Tax Ends June 2027

Measure S, the proposed half-cent sales tax to replace Fresno County’s expiring transportation funding, has 128,668 “no” votes to 122,159 “yes” votes as of the November 18 count — 51.3% opposed, 48.7% in favor. The 6,509-vote gap is virtually insurmountable with roughly 4,500 ballots left to process and 6,700 conditional on signatures by November 25, according to the Fresno County elections office.

The existing Measure C, a half-cent sales tax funding transportation for 40 years, sunsets June 30, 2027. No collection after that date. Projects already approved continue through 2029.

Opponents held a press conference November 20 at Seal Rite Paving, owned by Brooke Ashjian, chair of the Valley Watchdogs PAC. County Supervisor Garry Bredefeld called voters “real heroes.” They cited $3 billion in deferred maintenance and stated a need for a future measure — “truthful, accurate,” allocating less to transit, more to roads. Reedley Mayor Matt Tuttle referenced Fix Our Roads, a 20-year plan with 82% for local streets and highways, 18% for transit, that did not qualify for November. Clovis Mayor Pro Tem Diane Pearce said a 2028 ballot “is not unrealistic.”

Advertisement Advertisement

Supporters — the Better Roads Safe Streets coalition led by Veronica Garibay of the Leadership Counsel for Justice and Accountability — are not conceding. Campaign manager Andy Levine told the Fresno Bee they are waiting for all ballots and considering bringing the measure back. The coalition collected 32,000 signatures, held 34 public meetings, gathered input from 4,500 residents across 72 zip codes.

Measure S proposed $246 million annually over 30 years — roughly $7.4 billion total — with 65% for local streets and sidewalks, 25% for public transit.

The Breakdown

  • What Failed: Measure S, a half-cent sales tax for 30 years to replace the expiring Measure C. Would have raised $7.4 billion total: 65% for neighborhood streets and sidewalks, 25% for public transit, 4% for clean transportation and technology grants, remainder for administration and regional projects.
  • What Expires: Measure C, in place since 1986 and renewed 2006, ends June 30, 2027. No new collection after that. Existing funds continue supporting projects through 2029, including Highway 41 widening north of Lemoore, Shaw Avenue widening in Clovis, passing lanes on Highway 180 and Highway 33, and Highway 99 interchanges at American and North avenues.
  • Why It Failed: Supporters cite two factors: County supervisors’ majority opposition, which resulted in “new tax” ballot language despite Measure S replacing an existing tax, and Measure D — a half-cent general sales tax for Fresno city alone, which passed with 58% and was not labeled “new tax.” Fresno State political scientist Lisa Bryant noted confusion: “Right up until the last minute it was unclear whether it would be on the ballot.”
  • Who Loses Funding: All 15 cities and unincorporated Fresno County. A September Fresno Council of Governments study found smallest cities face the greatest burden. Mendota’s annual transportation revenue drops from $1.98 million to $1.49 million without Measure C, then to $874,000 without matching state/federal funds — a 56% cut. Mendota Mayor Victor Martinez: “It’s a big problem that we need to figure out.” Clovis Mayor Vong Mouanoutoua stated paratransit cuts and reduced road maintenance are coming; staffing and Stageline bus routes “for now” remain, with layoffs possible when funds end. San Joaquin, Huron, Firebaugh also face severe pressure.
  • Who Kept Funding: City of Fresno via Measure D, which passed and will generate more than $54 million annually for general purposes including public safety. Mayor Jerry Dyer said he will allocate funds to transit expansion, street paving, sidewalk repair in his next budget.

What This Means for You

If you live in any city except Fresno, your city will lose the Measure C revenue it has used for street repair, transit, and in some cases staff salaries starting July 1, 2027. The specific loss depends on your city: Mendota loses 56% of its transportation funding when state/federal matching ends, Clovis cuts paratransit and road work, and the smallest cities face cuts they may not be able to absorb without identifying new revenue or deferring maintenance. If you rely on paratransit, rural transit, or expect your streets maintained, that service level is not guaranteed past mid-2027 in any city but Fresno.

Three county supervisors opposed Measure S and controlled the “new tax” ballot language Garibay says misled voters. The supervisors’ framing and Measure D’s timing shaped this result.

If a new measure appears in 2028, the question is whether the coalition that wrote Measure S or the opposition led by Bredefeld, Ashjian, and Perea controls what goes on the ballot.

What You Can Do

Contact your city council or mayor to ask how they will address the loss of Measure C funding and whether they support a future transportation tax. Contact the Fresno County Board of Supervisors to state your position on a 2028 measure and what it should prioritize. If you submitted a ballot with a signature issue before November 25, resolve it with the Fresno County elections office to ensure your vote on this and other measures is counted.

What to Watch

Both sides say they will bring a new transportation tax to the 2028 ballot. The opposition, led by Bredefeld, Ashjian, and former Supervisor Henry Perea, is “running the numbers” on a measure that would exclude Fresno and Clovis, allocate more to roads, less to transit. Perea stated he opposes cutting transit funding entirely but questioned Measure S’s “massive increase” for it. Supporters led by Garibay say their coalition “isn’t going anywhere” and will stay involved in future measures.

The question is who controls the next measure and whose priorities it reflects. Measure S was shaped by 32,000 petition signatures and 34 public meetings. The opposition’s alternative, Fix Our Roads, did not qualify for the ballot and has not been publicly vetted at comparable scale. Perea himself said, “We’ve already done two scenarios where one side kills a measure. OK, but where did that get us?” and called for collaboration. Ashjian told the Fresno Bee the opposition has not reached out to Measure S organizers yet: “We’re going to do our victory dance first.”

The Central Valley Community Foundation contributed more than $1.1 million to the unsuccessful Measure S campaign. Whether they fund a future effort, and on what terms, is unresolved. Total spending in favor of Measure S reached $2.7 million, according to the opposition.

Watch whether the smallest cities — Mendota, San Joaquin, Huron, Firebaugh — which the September study identified as facing the greatest financial pressure, propose their own revenue measures or simply defer maintenance. Watch whether Clovis follows through on stated paratransit cuts and road-maintenance reductions, and whether layoffs materialize when Measure C funds end.

The unanswered question: why allocate new public dollars to building more roads when the material itself documents that 40 years of Measure C failed to maintain the roads already built? Opponents cite “$3 billion in deferred maintenance” and “potholes” as proof Measure C was ineffective, yet their stated priority is more of the same spending pattern — roads and highways first, transit as an afterthought — that produced the current deficit. If the problem is deferred maintenance, the alternative to Measure S is not no tax; it is deferred maintenance continuing until it costs more to fix or becomes unfixable. That cost and that risk fall on the smallest cities and their residents, not the officials or contractors celebrating November 20.

Related Coverage

Share this article Facebook X Pinterest LinkedIn Email

Leave a Reply

Advertisement Advertisement